Peco Service And Meter Application PDF Template

Peco Service And Meter Application PDF Template

The Peco Service and Meter Application form is a document used to request electric service and meter installation from PECO Energy. Completing this form accurately is essential for ensuring timely processing of service requests. To get started, fill out the application by clicking the button below.

Article Guide

The Peco Service and Meter Application form is an essential document for anyone seeking electric service from PECO. This form serves as a comprehensive guide for customers, electricians, and contractors to ensure that all necessary information is accurately provided for the installation of electric service and metering. It includes specific instructions on how to fill out the application, emphasizing the importance of completeness to avoid delays in processing. Key sections of the form require details such as the customer’s name, service location, and identification numbers, including either a driver's license or Social Security number. Additionally, applicants must specify the type of service requested, the current construction status, and provide information about the load characteristics and service characteristics. The form also highlights the need for a signed application and outlines the consequences of incomplete submissions. To facilitate a smooth process, applicants are encouraged to refer to the sample application provided alongside the blank form, ensuring they understand each section clearly before submission. Overall, this application is a critical step in establishing electric service with PECO, and attention to detail can significantly streamline the process.

Peco Service And Meter Application Preview

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER
Please refer to the sample application while reviewing the following notes. The letters below
correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE
"SAMPLE" FORM
A. After reading the instructions at the top of the application, locate the PECO
regional office in which the service is requested. Check the appropriate box and
mail or fax the completed application to the appropriate regional office.
B. Complete the fields for customer's name and service location. Customer's
Driver's License Number or Social Security Number is now required.
Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.
(**) Use the address of the service when applying for underwriter's inspection.
C. Complete the fields for customer's PECO billing address or account number
(within last 60 days).
D. Complete fields regarding you as the electrician or contractor, and indicate
where you would like the reply sent. The Electrician/Builder Tax Identification
number is now required. Also, please include the date you would like the reply
returned to you.
E. Indicate your current construction status, and include the date PECO service is
requested. Please avoid using "as soon as possible".
F. thru J. Indicate the following:
Type of Request
Type of Service (include number of units and area per unit)
Service Characteristics
Meter Information
Heating/Air Conditioning
K. Complete the table concerning the load characteristics of the service. For each
applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW
Demand, and 3) Maximum Winter KW Demand.
L. Complete the table concerning motor information.
M. If compensated metering will be used, indicate totalizer and general load (KW).
N. Include any additional comments.
O. Application MUST be signed and dated. Forms Rev. 5/18
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information
may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests
may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding
with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the
right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR
DEMOLITION REQUEST
NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com
PHILADELPHIA
COUNTY
830 S. Schuylkill Ave.
Philadelphia, PA 19146
Email:PhilaNewBusiness@e
xeloncorp.com
Fax # (215) 731-2327
DELAWARE & CHESTER COUNTIES
1050 W. Swedesford Rd.
Berwyn, PA 19312
Email:DelChesterServiceApplications@ex
eloncorp.com
Fax # (610) 725-1416
BUCKS & MONTGOMERY
COUNTIES
400 Park Ave.
Warminster, PA 18974
Email:Bucksmontserviceapplications@e
xeloncorp.com
Fax # (215) 956-3240
NEW RESIDENTIAL
CONSTRUCTION
(All Counties)
400 Park Ave.
Warminster, PA 18974
Email:NRCGMETERORDERS@P
eco-Energy.com
Fax # (215) 956-3380
CUSTOMER NAME Tax ID # or SSN
TYPE OF REQUEST
New Service
Temporary Service
Separation of Wiring
Load Increase/Decrease
Upgrade/Changes
Service Relocation
Reintroduction of Service
Demolition (Remove
Service)
Make-Safe (De-
energize/Cover)
** ADDRESS TO BE SERVED APARTMENT/LOT #
CITY, STATE ZIP CODE TYPE OF SERVICE: Please include site plan.
RESIDENTIAL COMMERICAL
Single House
Apartment
Duplex
Mobile Home
Modular Home
Town House
Store
Industrial
Restaurant
Office
Warehouse
Other _____________________________ Other _____________________________
Area of Building _______________________ Sq. Ft.
UTILITY POLE# SUBDIVISION/DEVELOPMENT TOWNSHIP/MUNICIPALITY/WARD#
* If Applicable
** Please use this address when applying for underwriter’s inspection
SERVICE CHARACTERISTICS:
PHASE VOLTS WIRES
Underground Aerial 3 240 3
AMPS _________
3 120/240 4
PHASE VOLTS WIRES 3 120/208 4
1 120 2 3 277/480 4
1 120/240 3 3 13200 3 or 4
2 120/240 5 3 33000 3 or 4
CUSTOMERS BILLING ADDRESS
-OR-
PECO ENERGY ACCOUNT#
CITY, STATE ZIP CODE TELE. #
SEND REPLY TO:
ELECTRICIAN’S OR BUILDER’S NAME METER INFO:
Two Meters, Commercial (General/Totalizer)
Single Meter Required Multiple Meter Total No. _____________
ADDRESS Reply Requested by:
/ /
HEATING/AIR CONDITIONING:
Central Air _____ Tons
Natural Gas
Resistance
Propane
Heat Pump _____ Tons
Type Back-Up _________
Other ________________
City, State ZIP CODE CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:
TYPE
CONNECTED
LOAD (kW)
PECO ENERGY USE ONLY (DEMAND)
TELE. # E-MAIL ADDRESS
SUMMER (kW) Winter (kW)
LIGHTING
CURRENT CONSUTRCTION STATUS:
Not Started Date Customer Will Start Work: _____/_____/_____ In Progress Completed
Approximate Date Service Requested: _____/_____/_____
HEATING
AIR/COND.
TANKLESS WATER HTR
MISC
CUSTOMER COMMENTS/ DESCRIPTIN OF WORK
TOTAL
Include single line diagram and substation arrangement if appropriate.
LARGEST MOTOR SPECIFICATIONS
QUANTITY
TOTALIZER LOAD
SIZE (HP)
KW
LOCKED ROTOR CURRENT
MOTOR CODE LETTER
SUBMITTED BY: _________________________________ DATE: ______________________
PHASE
GENERAL LOAD
VOLTAGE
A
B
F
C
D
E
G
I
J
K
M
L
N
O
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
KW
PURPOSE
INFORMATION BELOW WILL BE FILLED IN BY PECO:
Service Request No.
BUS/MAJ ACCT REP TELEPHONE DATA RECEIVED DESIGNER
TELEPHONE
DATA RECEIVED
POL SUB RATE RIDER CONTRACT LIMITS SIC NUMBER T
NUMBER
DATE REPLY
COMPLETED
AMPS WIRES VOLTAGE PHASE CIRCUIT C-QUAD T-QUAD LOAD (KVA)
SUMMER_____WINTER ____
SERVICE CHARACTERISITICS Select One from Each
SERVICE TYPE
Aerial Underground URD
RATE:
Residential Comm (Non-
Demand)
Comm (Demand) HT/PD
GENERATION PROCUREMENT CLASS:
Class 1 (Residential)
Class 3 (Commercial, 100kW to 500kW)
Class 2 (Commercial, less than 100kW)
Class 4 (Commercial, greater than 500kW)
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load
estimates for the first year of service. The customer’s Procurement Class will be adjusted each year,
based on actual usage.
METER TYPE:
KWH IND. DEMAND RECORDER TOU
SERVICE PHASING:
SINGLE PHASE TWO PHASE THREE PHASE
POLE # / MH # LOCATION CUT THROUGH DATE
SERVICE REQUIREMENTS:
Present Service OK
Taps Only
Loop Only
See Job # _________________________________
METERING LOCATION AND REQUIREMENTS:
Present Location: Meter # _______________ CTs-
________
PTs-________
Indoo
r
Outdoor On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above
Ground
ADVANCE NOTIFICATIONS:
Underwriter’s Cert.
Required
Yes No
Customer to Trench Yes No
Permit Required Yes No State
Other
_______________________
ACT 222 Cert. Required Yes #
_____________
No
N/A
PA One Call #
___________________________
Date
__________________________
Gas BTCO CATV Other
___________________
Date
__________________________
CUSTOMER BILLING:
Advance Billing
Required
Yes
No Customer
Charges:
$_______________
__
$_______________
__
Cust. #
_________________________
Date
___________________________
BTCO #
________________________
Date
___________________________
CATV #
________________________
Date
___________________________
Other
__________________________
Date
___________________________
SKETCH / INSTRUCTIONS
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information
may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests
may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding
with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the
right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR
DEMOLITION REQUEST
NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com
PHILADELPHIA COUNTY
830 S. Schuylkill Ave.
Philadelphia, PA 19146
Email:PhilaNewBusiness@ex
eloncorp.com
Fax # (215) 731-2327
DELAWARE & CHESTER COUNTIES
1050 W. Swedesford Rd.
Berwyn, PA 19312
Email:DelChesterServiceApplications@exe
loncorp.com
Fax # (610) 725-1416
BUCKS & MONTGOMERY
COUNTIES
400 Park Ave.
Warminster, PA 18974
Email:Bucksmontserviceapplications@e
xeloncorp.com
Fax # (215) 956-3240
NEW RESIDENTIAL
CONSTRUCTION
(All Counties)
400 Park Ave.
Warminster, PA 18974
Email:NRCGMETERORDERS@P
eco-Energy.com
Fax # (215) 956-3380
CUSTOMER NAME Tax ID # or SSN
TYPE OF REQUEST
New Service
Temporary Service
Separation of Wiring
Load Increase/Decrease
Upgrade/Changes
Service Relocation
Reintroduction of Service
Demolition (Remove
Service)
Make-Safe (De-
energize/Cover)
** ADDRESS TO BE SERVED APARTMENT/LOT #
CITY, STATE ZIP CODE TYPE OF SERVICE: Please include site plan.
RESIDENTIAL COMMERICAL
Single House
Apartment
Duplex
Mobile Home
Modular Home
Town House
Store
Industrial
Restaurant
Office
Warehouse
Other _____________________________ Other _____________________________
Area of Building _______________________ Sq. Ft.
UTILITY POLE# SUBDIVISION/DEVELOPMENT TOWNSHIP/MUNICIPALITY/WARD#
* If Applicable
** Please use this address when applying for underwriter’s inspection
SERVICE CHARACTERISTICS:
PHASE VOLTS WIRES
Underground Aerial 3 240 3
AMPS _________
3 120/240 4
PHASE VOLTS WIRES 3 120/208 4
1 120 2 3 277/480 4
1 120/240 3 3 13200 3 or 4
2 120/240 5 3 33000 3 or 4
CUSTOMERS BILLING ADDRESS
-OR-
PECO ENERGY ACCOUNT#
CITY, STATE ZIP CODE TELE. #
SEND REPLY TO:
ELECTRICIAN’S OR BUILDER’S NAME METER INFO:
Two Meters, Commercial (General/Totalizer)
Single Meter Required Multiple Meter Total No. _____________
ADDRESS Reply Requested by:
/ /
HEATING/AIR CONDITIONING:
Central Air _____ Tons
Natural Gas
Resistance
Propane
Heat Pump _____ Tons
Type Back-Up _________
Other ________________
CITY, STATE ZIP CODE CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:
TYPE
CONNECTED
LOAD (kW)
PECO ENERGY USE ONLY (DEMAND)
TELE. # E-MAIL ADDRESS #
SUMMER (kW) Winter (kW)
LIGHTING
CURRENT CONSUTRCTION STATUS:
Not Started Date Customer Will Start Work: _____/_____/_____ In Progress Completed
Approximate Date Service Requested: _____/_____/_____
HEATING
AIR/COND.
TANKLESS WATER HTR
MISC
CUSTOMER COMMENTS/ DESCIPTION OF WORK:
TOTAL
Include single line diagram and substation arrangement if appropriate.
LARGEST MOTOR SPECIFICATIONS
QUANTITY
TOTALIZER LOAD
SIZE (HP)
KW
LOCKED ROTOR CURRENT
MOTOR CODE LETTER
SUBMITTED BY: _________________________________ DATE: ______________________
PHASE
GENERAL LOAD
VOLTAGE
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
KW
PURPOSE
INFORMATION BELOW WILL BE FILLED IN BY PECO:
Service Request No.
BUS/MAJ ACCT REP TELEPHONE DATA RECEIVED DESIGNER
TELEPHONE
DATA RECEIVED
POL SUB RATE RIDER CONTRACT LIMITS SIC NUMBER T NUMBER DATE REPLY
COMPLETED
AMPS WIRES VOLTAGE PHASE CIRCUIT C-QUAD T-QUAD LOAD (KVA)
SUMMER_____WINTER
____
SERVICE CHARACTERISITICS Select One from Each
SERVICE TYPE
Aerial Underground URD
RATE:
Residential Comm (Non-Demand) Comm (Demand) HT/PD
GENERATION PROCUREMENT CLASS:
Class 1 (Residential)
Class 3 (Commercial, 100kW to 500kW)
Class 2 (Commercial, less than 100kW)
Class 4 (Commercial, greater than 500kW)
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for
the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage.
METER TYPE:
KWH IND. DEMAND RECORDER TOU
SERVICE PHASING:
SINGLE PHASE TWO PHASE THREE PHASE
POLE # / MH # LOCATION CUT THROUGH DATE
SERVICE REQUIREMENTS:
Present Service OK
Taps Only
Loop Only
See Job # _________________________________
METERING LOCATION AND REQUIREMENTS:
Present Location: Meter # _______________ CTs- ________ PTs-________
Indoor Outdoor On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground
ADVANCE NOTIFICATIONS:
Underwriter’s Cert. Required Yes No
Customer to Trench Yes No
Permit Required Yes No State Other _______________________
ACT 222 Cert. Required Yes # _____________ No N/A
PA One Call # ___________________________ Date __________________________
Gas BTCO CATV Other ___________________ Date __________________________
CUSTOMER BILLING:
Advance Billing Required Yes
No Customer Charges:
$_________________
$_________________
Cust. # _________________________ Date ___________________________
BTCO # ________________________ Date ___________________________
CATV # ________________________ Date ___________________________
Other __________________________ Date ___________________________
SKETCH / INSTRUCTIONS

File Properties

Fact Name Details
Application Purpose The PECO Service and Meter Application form is designed for customers requesting electric service and meter installation.
Required Information Customers must provide their name, service location, and either a Driver's License Number or Social Security Number.
Service Requests Various types of service requests can be made, including new service, load increase/decrease, and temporary service.
Construction Status Applicants need to indicate their current construction status and specify the date when PECO service is requested.
Load Characteristics A table within the application requires details on load characteristics, including connected KW and maximum demand for summer and winter.
Inspection Compliance All work must comply with PECO's Electric Service Requirements manual and be inspected by an approved agency.
Governing Laws This application is governed by Pennsylvania laws and regulations related to electric service provision and safety standards.

Instructions on Utilizing Peco Service And Meter Application

Filling out the PECO Service and Meter Application form is a straightforward process. To ensure your application is processed without delays, follow the steps outlined below. Make sure to provide accurate information and double-check your entries before submitting.

  1. Read the instructions at the top of the application.
  2. Locate the appropriate PECO regional office for your service request and check the corresponding box.
  3. Complete the customer's name and service location fields. Include the Driver's License Number or Social Security Number.
  4. Fill in the PECO billing address or account number if applicable.
  5. Provide your details as the electrician or contractor, including your Tax Identification number and the desired reply date.
  6. Indicate your current construction status and the date you want PECO service to start. Avoid vague terms like "as soon as possible."
  7. Specify the type of request and type of service, including the number of units and area per unit.
  8. Fill out the service characteristics and meter information sections.
  9. Complete the load characteristics table, providing connected KW, maximum summer KW demand, and maximum winter KW demand for each applicable load type.
  10. Complete the motor information section if applicable.
  11. If using compensated metering, indicate the totalizer and general load in KW.
  12. Add any additional comments that may be relevant to your application.
  13. Sign and date the application to complete the process.

Important Facts about Peco Service And Meter Application

What is the purpose of the Peco Service and Meter Application form?

The Peco Service and Meter Application form is used to request electric service from PECO. It provides essential information about the service location, customer details, and the type of service required. Completing this form accurately ensures that your request is processed smoothly and efficiently.

How do I know which PECO regional office to send my application to?

At the top of the application, you will find instructions to locate the appropriate PECO regional office based on where the service is needed. Be sure to check the right box on the application and send it via mail or fax to the correct office to avoid delays.

What information do I need to provide on the application?

You will need to fill out your name, service location, and either your Driver's License Number or Social Security Number. Additionally, include your PECO billing address or account number from the last 60 days. If you are the electrician or contractor, you must also provide your Tax Identification Number and the desired response date.

What happens if I do not complete the application correctly?

Incomplete applications may result in delays in processing your request. To avoid this, carefully follow the instructions provided in the application. Double-check that all required fields are filled out before submitting it.

What should I do if I need PECO to remove electric or gas facilities during a demolition?

If you are demolishing a building and need PECO to remove electric or gas facilities, you should call 8-1-1 (PA One Call) for a demolition request. This step is crucial to ensure safety and compliance with regulations.

Is there a deadline for submitting additional information after I submit my application?

Yes, PECO reserves the right to cancel your request if they do not receive further communication from you within 90 days of their response date. It’s important to stay in touch and provide any additional information as needed.

What should I do if I have questions while filling out the application?

If you have questions, don’t hesitate to reach out to PECO’s customer service for assistance. They can provide guidance on completing the application and help clarify any details you may be unsure about.

Common mistakes

Filling out the PECO Service and Meter Application form can be straightforward, but several common mistakes can lead to delays or complications. One significant error is failing to provide the correct customer information. Applicants often neglect to include their full name, service location, or required identification numbers, such as a driver's license or Social Security number. This omission can result in immediate rejection of the application.

Another frequent mistake involves the incomplete or incorrect indication of the type of service requested. Applicants may check multiple boxes or fail to specify whether they need new service, a load increase, or another type of request. Clarity in this section is crucial, as PECO needs to understand the nature of the service required to process the application efficiently.

Many applicants also overlook the importance of including the PECO billing address or account number from a recent bill. This information is essential for PECO to verify the applicant's identity and service history. Without it, processing can stall. Similarly, applicants sometimes neglect to complete the electrician or contractor fields, which are necessary for PECO to know who to contact regarding the service installation.

Another common error is vague language in the construction status section. Phrases like "as soon as possible" do not provide a clear timeline for when service is needed. Instead, applicants should specify exact dates to avoid confusion. Additionally, failure to fill out the load characteristics table accurately can lead to misunderstandings about the service requirements, potentially resulting in insufficient service being provided.

In the motor information section, applicants often forget to indicate the totalizer and general load if compensated metering is being used. This information is critical for PECO to assess the service requirements accurately. Furthermore, neglecting to sign and date the application is a simple but crucial oversight that can lead to outright rejection of the application.

Lastly, applicants frequently miss the opportunity to provide additional comments or details about their specific needs. This section can be used to clarify unique circumstances or requests that might not be covered elsewhere in the application. By including this information, applicants can help ensure that their needs are understood and met promptly.

Documents used along the form

The Peco Service and Meter Application form is an essential document for requesting electric service. However, several other forms and documents are often required to ensure a smooth application process. Below is a list of these documents, along with brief descriptions of each.

  • Credit Application and Agreement: This document is necessary for customers who have not received PECO service in the past 60 days. It establishes the customer's creditworthiness and outlines the terms of service.
  • Site Plan: A detailed drawing of the property layout is required to show where the electric service will be connected. This helps PECO assess the installation requirements.
  • Single Line Diagram: This diagram illustrates the electrical system's layout, including the connection points and the flow of electricity. It is crucial for understanding the service requirements.
  • Substation Arrangement: This document provides information on how the electrical service will connect to the substation, ensuring that the infrastructure can support the new load.
  • Load Characteristics Table: A table detailing the expected electrical load, including connected kilowatts and peak demand, helps PECO determine the appropriate service size.
  • Motor Information Sheet: If motors are part of the service request, this sheet provides specifications like horsepower and locked rotor current, which are essential for proper service planning.
  • Inspection Agency Approval: Documentation from an approved inspection agency is required to confirm that all electrical work complies with local regulations and safety standards.
  • Demolition Notification: If the application involves demolishing a building, this notification is necessary to request the removal of electric or gas facilities safely.
  • Tax Identification Number (TIN) or Social Security Number (SSN): This information is required to verify the identity of the applicant and for tax purposes.
  • Advance Notification Form: This form alerts PECO to any special conditions or requirements for the service installation, ensuring that all parties are informed ahead of time.

These documents collectively facilitate the processing of the Peco Service and Meter Application form. Each plays a vital role in ensuring that the application is complete and compliant with all necessary regulations, ultimately leading to a successful installation of electric service.

Similar forms

  • Application for Water Service: This document requests water service from a utility provider. Similar to the Peco Service and Meter Application, it requires customer identification, service location details, and specific service requests.
  • Gas Service Application: Like the Peco form, this application is used to initiate gas service. It includes sections for customer information, service type, and installation requirements, ensuring all necessary details are captured for processing.
  • Electrical Load Analysis Form: This form is utilized to assess the electrical load requirements of a property. It parallels the Peco application by collecting information on connected loads and service characteristics, which aids in determining service capacity.
  • Building Permit Application: This document is required for construction projects. It shares similarities with the Peco application by necessitating detailed project descriptions, service needs, and compliance with local regulations.
  • Inspection Request Form: Used to schedule inspections for electrical installations, this form resembles the Peco application in its requirement for specific service details and the identification of responsible parties, such as contractors.
  • Service Relocation Request: This document is submitted when a customer needs to move existing utility services. It mirrors the Peco application by requiring customer information, service characteristics, and the reasons for relocation.

Dos and Don'ts

Things You Should Do:

  • Read the instructions carefully before starting the application.
  • Locate the correct PECO regional office and check the appropriate box.
  • Provide your full name and the service location accurately.
  • Include your Driver's License Number or Social Security Number as required.
  • Complete all fields related to the electrician or contractor.
  • Indicate the current construction status clearly.
  • Specify the type of service and request details accurately.
  • Fill out the load characteristics table completely.
  • Sign and date the application before submission.
  • Include any additional comments that may help in processing your request.

Things You Shouldn't Do:

  • Do not leave any fields blank; incomplete information can delay processing.
  • Avoid using vague terms like "as soon as possible" for service requests.
  • Do not forget to include the PECO Energy pole number or Lot number if applicable.
  • Do not submit the application without a proper signature and date.
  • Do not assume service availability; verify before making any purchases.
  • Do not neglect to follow up if you do not receive a response within 90 days.
  • Do not mix up the billing address and service address; they must be distinct.
  • Do not disregard the requirement for an underwriter's inspection address.
  • Do not forget to provide your tax identification number or SSN.
  • Do not submit multiple applications for the same service request.

Misconceptions

  • Misconception 1: The application can be submitted without a driver's license or Social Security number.
  • This is incorrect. The application now requires either the customer’s Driver's License Number or Social Security Number. This information is essential for processing the application.

  • Misconception 2: All service voltages are available in every area.
  • Not true. Availability of service voltages varies by location. It is crucial to check with PECO before making any purchases or wiring plans.

  • Misconception 3: The application does not need to be signed.
  • This is false. The application must be signed and dated. An unsigned application will lead to delays in processing.

  • Misconception 4: You can indicate "as soon as possible" for service request dates.
  • This is not acceptable. Applicants must provide a specific date for when PECO service is requested. Vague requests will not be processed efficiently.

  • Misconception 5: You do not need to provide load characteristics for the service.
  • This is incorrect. The application requires detailed information about load characteristics, including connected KW and maximum demand for summer and winter.

  • Misconception 6: You can submit the application without including any additional comments.
  • Misconception 7: PECO will automatically follow up if there is no communication from the customer.
  • This is misleading. If PECO does not receive further communication from the customer within 90 days of their response, they reserve the right to cancel the request.

Key takeaways

When filling out the PECO Service and Meter Application form, consider the following key takeaways:

  • Accurate Information: Ensure that all fields, especially customer name, service location, and contact details, are completed accurately to avoid delays.
  • Required Identifications: Provide either the customer’s Driver’s License Number or Social Security Number. This is now mandatory.
  • Construction Status: Clearly indicate the current construction status and the specific date you are requesting service. Avoid vague terms like "as soon as possible."
  • Load Characteristics: Fill out the load characteristics table completely, including connected KW and maximum demand for both summer and winter.
  • Signature Requirement: Don’t forget to sign and date the application. An unsigned application will not be processed.

Following these guidelines will help ensure a smoother application process with PECO.